U.V. DisinfectionINSTALLATION & OPERATION MANUALThis manual covers installation, operation and maintenancerequirements for Neptune U.V. Disinfecti
10U.V. LAMPS:INSTALLATION OF THE ULTRAVIOLET LAMPS:**DO NOT PUT POWER ON AT THIS TIME!**CAUTION: Never look directly at a operating U.V. lamp op
11SANITATION PROCEDURE FOR INSTALLATION AND BULB REPLACEMENT:HOW TO DISINFECT A WATER SYSTEM:Every new well, or existing water supply syst
12LARGE DIAMETER WELLS: Dug or bored wells should be disinfected in the same way as a drilled one. Lower the water level as much as possible, r
13REMEMBER - To make your water supply safe: - Locate your well properly. - Protect it from surface contamination. - Test water periodically
14DRILLED WELLS: 1. Remove the cap or seal from the casing and measure the depth of the water in the well, then refer to Table 1 to determine
15TROUBLESHOOTING GUIDE PROBLEM CAUSE CORRECTIONU.V. lamp will not light Check input voltage if below Install a voltage
16LIMITED WARRANTY All parts of the disinfection unit, with the exception of the U.V. lamp, are guaranteed for one (1) year a
17Model # Max. Flow No. Lamps KW @ AMP @ Pipe Size Overall Dimensions Shipping GPM
18SUGGESTED PROCEDURE FOR OBTAINING STERILE WATER SAMPLES:Prior to taking the water sample, be sure to have on hand an adequate supply of sterile
19WIRING DIAGRAM
2SAFETY INSTRUCTIONSWARNING - to guard against injury, basic safety precautions should be observed, including the following:1. READ A
20
21DRAWING AND PART NUMBERS
22TRI-8 Explosion
23 CODE PART# DESCRIPTION QTY. 1 WTA-5249 Chamber 1 2 WTA-R01 ¾” Flo.-Et. Retainer 8 gpm 1 3 WTA-F08 8 gpm Fl
24TRI-12 Explosion
25TRI-12 Parts List CODE PART# DESCRIPTION QTY. 1 WTA-5252 Chamber 1 2 WTA-R02 ¾” Flo.-Et. Retainer 12 gpm 1 3 W
26TRI-20 Explosion
27 CODE PART# DESCRIPTION QTY. 1 WTA-5266 Chamber 1 2 WTA-5173 Site Port O-Ring 1 3 WTA-5172 Site Port Lens
3FUNCTION:The function of this ultraviolet disinfection unit is to provide in excess of 99% reduction of all water borne pathogenic (disease caus
4GENERAL CONSIDERATIONS FOR ALL DISINFECTION UNITS:1. When installing the equipment, it is necessary that the unit be isolated from vibration,
5STEP BY STEP INSTALLATION: 1. Turn off the water before cutting into the water line. 2. Assess the installation (i.e. type of pipe, size of li
6WTA-280CB
7OPERATING INSTRUCTIONSYour UV System is equipped with the ATS-280CB UV Lamp Detector and Timer circuit board which is designed to provide a cont
8To Find out how many Months are left on the Lamp Timer - Push the reset button for 1-2 seconds then release. After an initial sound there will b
9QUARTZ SLEEVE:Installation of the Quartz Sleeve:Always handle quartz sleeves carefully to prevent breaking or chipping. The quartz sleeves are
Comentários a estes Manuais